Follow Us

naics

35 Pages

PRESOLICITATION - Y--Central Control Station Operating Machinery Power, Control, and Lighting Rehabilitation, Upper St. Anthony Falls Lock and Dam, Minneapolis, MN
Published Department of the Army  7/7/2014
The U. S. Army Corps of Engineers (USACE) St. Paul District intends to issue an Invitation for Bid (IFB) for Central Control Station Operating Machinery Power Control Rehabilitation, Upper St. Anthony Falls Lock and Dam, located in Minneapolis, MN. Project involves replacing selected central
https://www.fbo.gov/spg/USA/CO ...
| |

SOURCES SOUGHT - C--North American Electric Reliability Corporation (NERC) Generator Model Validation Testing.
Published Department of the Army  7/3/2014
This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The U.S. Army Corps of Engineers Northwestern Division Portland District (CENWP) has been
https://www.fbo.gov/spg/USA/CO ...
| |

PRESOLICITATION - B--Understanding and Mitigating the Effects of Marine Renewable Energy Technologies
Published Department of the Interior  6/18/2014
PLEASE READ THIS NOTICE CAREFULLY AS IT CONSTITUTES THE ONLY NOTICE THAT WILL BE ISSUED. The U.S. Department of the Interior (DOI), Bureau of Safety and Environmental Enforcement (BSEE), on behalf of the Bureau of Ocean Energy Management (BOEM), intends to competitively award a contract entitled
https://www.fbo.gov/spg/DOI/MM ...
| |

PRESOLICITATION - Y--Dexter Dam Electrical Reliability Upgrades
Published Department of the Army  6/2/2014
The U.S. Army Corps of Engineers, Portland District, has a requirement for the Dexter Dam Electrical Reliability Upgrades, Dexter, Lane County, OR with a Magnitude of Construction ranging between $1,000,000.00 and $5,000,000.00. The purpose of this project is to upgrade the reliability of the
https://www.fbo.gov/spg/USA/CO ...
| |

PRESOLICITATION - Renewable electric power supply for various Federal Accounts in PJM
Published General Services Administration  5/30/2014
Renewable electric power supply for various Federal Accounts in PJM NAICS Codes 221111, 221114, 221115, 221116, 221117 and 221118 The General Services Administration is requesting proposals from small businesses for the provision of grid based electric supply with or without
https://www.fbo.gov/spg/GSA/PB ...
| |

PRESOLICITATION - Z--WICKET GATE SEALS REPLACEMENT FOR TWO 33,800 HP TURBINES, LOST CREEK DAM, JACKSON COUNTY, OREGON
Published Department of the Army  5/16/2014
NAME OF PROJECT: Lost Creek Wicket Gate Seals Replacement LOCATION OF PROJECT: Lost Creek Powerhouse in Jackson County, Oregon, located at William L. Jess Dam (aka Lost Creek Dam), approximately 30 miles northeast of Medford, Oregon on the Rogue River. MAGNITUDE OF CONSTRUCTION: Between
https://www.fbo.gov/spg/USA/CO ...
| |

SOURCES SOUGHT - Z--Garrison Dam Powerhouse and West Terrace Drain Rehab West Abutment Sand Drain
Published Department of the Army  4/23/2014
Garrison Dam Powerhouse and West Terrace Drain Rehab West Abutment Sand Drain The U.S. Army Corps of Engineers, Omaha District, is seeking qualified members of the Small Business community (e.g., Small Business (SB), 8(a) Program Participant, HubZone, Small Disadvantaged Business (SDB)
https://www.fbo.gov/spg/USA/CO ...
| |

PRESOLICITATION - Z--Harlan County Lake Dam Wiring Project
Published Department of the Army  4/23/2014
Synopsis No. W912DQ-14-R-1048 Electrical Wiring Replacement at Harlan County Lake Dam Harlan County, NE The U.S. Army Corps of Engineers, Kansas City District, intends to issue a solicitation for Electrical Construction Services for replacing the electrical wiring at Harlan County Lake Dam, in
https://www.fbo.gov/spg/USA/CO ...
| |

PRESOLICITATION - Y--JOHN DAY POWERHOUSE DC SYSTEM UPGRADE
Published Department of the Army  10/3/2013
The purpose of this project is to replace and upgrade significant portions of the DC and preferred AC system at John Day Dam Powerhouse, Sherman County, Oregon. The DC and preferred AC system in the John Day Powerhouse consists of several 125VDC, 250VDC, and 48VDC battery banks, along with
https://www.fbo.gov/spg/USA/CO ...
| |

NOTE - Z--NOTICE OF A PRE-SOLICTATION CONFERENCE AT THE WORK SITE FOR A PROPOSED SOLICITATION FOR WICKET GATE SEALS REPLACEMENT FOR TWO 33,800 HP TURBINES AT LOST CREEK DAM, TRAIL, OREGON.
Published Department of the Army  9/10/2013
Synopsis: The United States Army Corps of Engineers, Portland District, will conduct a Pre-Solicitation Conference at the work site of the Lost Creek Wicket Gate Seals Replacement Project at 10:00 am local time on 9 October 2013 at the Rogue River Basin Project Office located at William L. Jess
https://www.fbo.gov/spg/USA/CO ...
| |


Popular

There are no Bids popular in this category

Sources

Follow


Renewables Rising: Wind, Solar, Geothermal and Biomass Will Top Hydropower in 2014

Renewables Rising: Wind, Solar, Geothermal and
| |

National Trust mansion restores hydroelectric heritage

National Trust mansion restores hydroelectric
| |





    Global hydropower investment to top $75bn through to 2020

    Global hydropower investment to top $75bn through
    | |

    Man powers his home from local stream with DIY micro-hydro plant

    Man powers his home from local stream with DIY
    | |

    Floating Hydroelectric Waterfall Prison Generates Renewable Energy at Sea

    Floating Hydroelectric Waterfall Prison Generates
    | |

    Approval for £800m hydro scheme but SSE not yet ready to commit

    Approval for £800m hydro scheme but SSE not yet
    | |

    Pelamis powers up latest wave energy device

    Pelamis powers up latest wave energy device
    | |

    Why Wave Power Has Lagged Far Behind as Energy Source

    Why Wave Power Has Lagged Far Behind as Energy
    | |

About EnvironmentGuru

EnvironmentGuru.com is the largest online search portal that offers a place for environmental professionals to collaborate, find, and distribute environmental information from social, news, universities, governemnt agencies, and you. Built off state of the art technology and developed considering security as the highest priority. 

Find Out More →