EnvironmentGuru
Search
Search


Assessment News


Moe ch.4, problem 4.1 What was exposure?

Nuke Worker

Please help me. I can not work out how to do this problem in Operational Health Physics Training by Moe. 4.1 ProblemA charged cylindrical

1/21/2019

Orex Awards Airborne Geophysical Contract for the San Luis del Cordero

PR Newswire

VANCOUVER, Jan. 21, 2019 /PRNewswire/ - Orex Minerals Inc. -- (TSXV: REX -- OTCQX: ORMNF) ("Orex"), is pleased to announce that Geotech Ltd. has

1/21/2019

20 years later, Libby s asbestos fight goes on

Missoulian

LIBBY — The bleak world of asbestos science is tinged with subtle hues of gray and white, barely perceptible shadows that don't strike the

1/20/2019

Updated: Project Summary for ER-201428: Long-Term Performance

Department of Defense

Project ID: ER-201428 Project Title: Long-Term Performance Assessment at a Highly Characterized and Instrumented DNAPL Source Area

1/20/2019

Hard terrain slows rescue of Spanish boy trapped in borehole

Washington Post

Rescuers in southern Spain say that the frantic effort to reach a two-year-old boy who fell into a borehole seven days ago have again been

1/20/2019

Spanish rescuers start drilling to reach boy trapped in well for six

UK Gaurdian

Julen Roselló, aged two, fell down the 100m borehole while out walking with his parents near MálagaRescuers in southern Spain have began

1/20/2019

Rock strength and texture evolution during deformation in the Earth s

Wiley

Abstract Building upon the two-phase and grain damage theory, we propose a new formulation allowing to track the evolution of phase

1/20/2019

Boy, 2, Remains Trapped In 100-Meter-Deep Well In Spain For Sixth Day

Huffington Post

Rescue efforts continue in a bid to extract the youngster from a borehole in Totalan near Malaga.

1/19/2019

Updated: Project Summary for ER-1690: Mobility of Particulate and

Department of Defense

Project ID: ER-1690 Project Title: Mobility of Particulate and Dissolved Munitions Constituents in the Vadose Zone at Operational Ranges

1/19/2019

Updated: Project Summary for ER-2310: A Practical Approach for

Department of Defense

Project ID: ER-2310 Project Title: A Practical Approach for Remediation Performance Assessment and Optimization at DNAPL Sites for Early

1/19/2019

Top Tags

Asbestos Site Inspection Site Investigation Borehole Geophysical Survey Water Sample Detection Limit Data Quality Objective Background Level Bulk Sample Hydrogeologist Groundwater Monitoring Remedial Investigation Preliminary Assessment Monitoring Well ARAR Long-Term Monitoring Soil Boring Cross Contamination Long term monitoring Gas Chromatograph Ionization Chamber NAPL Source Area Extraction Procedure 
Don’t Let My Story Become Your Story: EPA Must Ban Asbestos Now

Assessment

Don’t Let My Story Become Your Story: EPA Must Ban Asbestos Now

The first application of quantitative 1 H NMR spectroscopy as a simple and

Assessment

The first application of quantitative 1 H NMR spectroscopy as a simple and

US developed technique turns smartphones into rapid radiation detectors

Assessment

US developed technique turns smartphones into rapid radiation detectors

Osisko hits 2,223 g/t over 2.0 metres at Windfall

Assessment

Osisko hits 2,223 g/t over 2.0 metres at Windfall

Site investigation business opens its first Scottish office

Assessment

Site investigation business opens its first Scottish office

ASAP Compact, Automated, Inexpensive, and Field-Deployable Vacuum-Outlet

Assessment

ASAP Compact, Automated, Inexpensive, and Field-Deployable Vacuum-Outlet