EnvironmentGuru
Search
Search

Treatment Plant


Notice of Proposal to Issue an Air Quality Control Construction Permit

State of Alaska

PUBLIC NOTICESTATE OF ALASKADEPARTMENT OF ENVIRONMENTAL CONSERVATIONALASKA GASLINE DEVELOPMENT CORPORATIONGAS TREATMENT PLANT The Alaska

7/18/2019

Forest Grove Outfall Pipeline - Phase B Project No. 6880

Clear Water Service

Sealed Bids for construction of the Forest Grove Outfall Pipeline - Phase B Project number 6880 (Project), must be addressed to Michelle Mann,

7/18/2019

Request for Proposals - Biosolids Hauling Services

Clear Water Service

Clean Water Services (District) wishes to enter into a contract for On Call Biosolids Hauling Services. Interested contractors must submit

7/18/2019

Durham AWWTF TPS Building Landscape Irrigation Project No. 6788.20

Clear Water Service

Sealed Bids for construction of Durham AWWTF TPS Building Landscape and Irrigation Project No. 6788.20 (Project), must be addressed to Michelle

7/18/2019

An ‘emerging pollutant’ in the Farmington River triggers claims about

Environment News Bits

Read the full story in the Hartford Courant. When potentially toxic firefighting foam began flowing through the sewers into a Windsor waste

7/17/2019

Request for Proposals - Biosolids Hauling Services

Clear Water Service

Clean Water Services (District) wishes to enter into a contract for On Call Biosolids Hauling Services. Interested contractors must submit

7/17/2019

Durham AWWTF TPS Building Landscape Irrigation Project No. 6788.20

Clear Water Service

Sealed Bids for construction of Durham AWWTF TPS Building Landscape and Irrigation Project No. 6788.20 (Project), must be addressed to Michelle

7/17/2019

Forest Grove Outfall Pipeline - Phase B Project No. 6880

Clear Water Service

Sealed Bids for construction of the Forest Grove Outfall Pipeline - Phase B Project number 6880 (Project), must be addressed to Michelle Mann,

7/17/2019

Notice of Proposal to Issue an Air Quality Control Construction Permit

State of Alaska

PUBLIC NOTICESTATE OF ALASKADEPARTMENT OF ENVIRONMENTAL CONSERVATIONALASKA GASLINE DEVELOPMENT CORPORATIONGAS TREATMENT PLANT The Alaska

7/17/2019

Forest Grove Outfall Pipeline - Phase B Project No. 6880

Clear Water Service

Sealed Bids for construction of the Forest Grove Outfall Pipeline - Phase B Project number 6880 (Project), must be addressed to Michelle Mann,

7/17/2019

Top Tags

wildlife Climate Change sustainability Species wastewater renewable energy Biology agricultural Natural Resource Habitat recycling DEPARTMENT OF ENERGY water resources recycled water treatment Ecology Hazardous Waste Geology Geology Asbestos Sewer air quality Disposable BOILER Biotechnology 
Avi Loeb on the search for life beyond Earth - Democrats say no one is

Climate

Avi Loeb on the search for life beyond Earth - Democrats say no one is

Democrats say no one is above the law – except on immigration - Democrats

Solid Waste

Democrats say no one is above the law – except on immigration - Democrats

ASAP Deterioration Mechanism of a Tertiary Polyamide Reverse Osmosis

Water Treatment

ASAP Deterioration Mechanism of a Tertiary Polyamide Reverse Osmosis

Discount retailer Fred’s to shutter 129 locations

Infrastructure

Discount retailer Fred’s to shutter 129 locations

IsaMill reduces specific energy requirements by up to 21.5 percent with new

Buildings

IsaMill reduces specific energy requirements by up to 21.5 percent with new

ABB closes the short interval control and scheduling loop

Buildings

ABB closes the short interval control and scheduling loop