Information Type
Category
Keyword
Order
Source
City
Country
State

In SOUTH KOREA


Please see attached PWS

Yuil E&C Const. won a $1,674,151.00 contract from Department of the Army for conducting Repair CBRN Protection System. Contract was solicited under solicitation W91QVN18R0049

PERFORMANCE WORK STATEMENT 1. DESCRIPTION OF SERVICES. The contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performe

BRAND NAME OR EQUAL ITEM : BIDD SEWER CLEANER TRUCKBIDEL: TSC-85C (BIDD TYPE)MFR: RETECH CO., LTDPLEASE REFER ATTACHED SOLICITATION

REPLACE DOMESTIC HOT WATER HEATER AT BLDG NO. 100 (ARMY LODGING), CAMP CARROLL, KOREA"THIS IS NON-WORK PLAN TASK ORDER FOR THE MATOC CONTRACTORS ONLY"CLOSING DATE: 12 SEPTEMBER 2017, 01:00PM LOCAL TIME.

SYNOPSIS ANNOUNCEMENT: 29 AUG 17SOLICITATION NO.: W91QVN-17-R-0211, REMOVAL AND DISPOSAL OF SLUDGE AND WASTE FROM WASTE WATER FACILITIES IN AREA IIIDESCRIPTION: Removal and Disposal of Sludge and Waste from Waste Water Facilities in Area III. This r

Replace Sprinkler System at ACFT Washrack, B2827 Kunsan ABThis is a Non-Work Plan task order for the follow ing MATOC Contractors Only: W91QVN-14-D-0031, -0032, -0033-, -0035, -0036, -0037, -0038, -0039, -0040, -0041, -0044, -0045, -0046, -0047, -00

The contractor shall provide all instructors, transportation, tools, training materials, supervision, and other items necessary to perform HAZMAT Training.

1.Solicitation No.W90VN9-17-R-0030 is for Replace and Modify the Existing Drain for dog Kennel, Bldg #414 at Camp Walker.2. The closing date/time is on 7 September 2017, 01:00 pm (Korean Local Date/Time).

See attached RFP and detailed Instruction to Offerors, Statement of Work, and applicable drawings.








Trending News