EnvironmentGuru
Search
Search

COGECO PRIVATE LIMITED


  • Summary
    CONTRACT SUMMARY 
    VendorCOGECO PRIVATE LIMITED
    SummaryMANPOWER REPORTING AND LIST OF INSPECTION OFFICES.
    Source USASpending
    Value$0.00
    SolicitationSP060013C5306
    ModificationP00003
    Contracting AgentDEFENSE LOGISTICS AGENCY
    Set-AsideNO SET ASIDE USED.
    PSCH391 - INSPECTION- FUELS LUBRICANTS OILS AND WAXES
    # Of Offers4
    Proposed Completion11/30/2013
    # Of Actions1
    Competition TypeFULL AND OPEN COMPETITION
    Contracting Agency NameDLA ENERGY
    Contracting AgencyDEFENSE LOGISTICS AGENCY
    Funding AgencyDEFENSE LOGISTICS AGENCY
    Contract PricingFIRM FIXED PRICE
    Performance CountryPAKISTAN
    Place Of ManufacturerNOT A MANUFACTURED END PRODUCT
    Action TypeOTHER ADMINISTRATIVE ACTION
    Determination Of SizeOTHER THAN SMALL BUSINESS
    DOD Claimant ProgramSERVICES
    GFETRANSACTION DOES NOT USE GFE/GFP
    Major ProgramBY-OVERSEAS LABORATORY TESTING
    National InterestNONE
    Pricing CodeJ
    Solicitation ProceduresNEGOTIATED PROPOSAL/QUOTE
    Subcontracting PlanPLAN NOT REQUIRED
    SustainabilityNO CLAUSES INCLUDED AND NO SUSTAINABILITY INCLU
    Vendor Address 140A1 PECO ROAD TOWNSHIP
    Vendor CityLAHORE
    Vendor StateNAN
    Annual Revenue5000000
    Vendor Number Of Employees100
    Vendor ParentCOGECO PRIVATE LIMITED
    Vendor Parent DUNS645502316
    Vendor DUNS645502316
    Vendor Country EntityFOREIGN-OWNED BUSINESS NOT INCORPORATED IN THE U.S.
  • Orders

    There are no contract awards associated with this contract in our database. Click the button below to search the Federal Procurement Data System (FPDS).

    FPDS
  • Related
    There are no modifications for this opportunity
  • Contacts


Comments


Colorado adopts California zero-emissions vehicle mandate

Air Quality

Colorado adopts California zero-emissions vehicle mandate

Touring Trollworks Biochar Plant

Natural Resources

Touring Trollworks Biochar Plant



Latest Opportunities

Testing of compounds in rat pharmacokinetic experiments

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; propo

Natural Design: An Intensive Two-Day Workshop Developed by Larry Weaner (Virginia)

Description:Demand for high performing, ecology-based landscapes is increasing faster than the availability of the specialized knowledge needed to achieve them. This intensive, interactive, two-day workshop will provide concrete, real world guidance

Natural Design: An Intensive Two-Day Workshop Developed by Larry Weaner (New Jersey)

Description:Demand for high performing, ecology-based landscapes is increasing faster than the availability of the specialized knowledge needed to achieve them. This intensive, interactive, two-day workshop will provide concrete, real world guidance

Grant to embed engagement

NERC is creating a new strategy for public engagement with environmental science research. To support this, we are inviting proposals for small projects which will demonstrate how the NERC public engagement with research strategy aligns with activit

AO: Knowledge Exchange Coordinator

Proposals are invited for a Knowledge Exchange Coordinator for the UK International Ocean Discovery Program (UK IODP). The Knowledge Exchange Coordinator will be tasked with establishing, maintaining and energising links with the wider environmental


Latest Awards

O'malley Brothers Corp

SCHAAKE HABITAT WOOD

FISH AND GAME, IDAHO DEPT OF

RIRIE RESERVOIR MITIGATION, UPPER SNAKE FIELD OFFICE, BONNEVILLE COUNTY, IDAHO

SALCHA-DELTA SWCD

TASK ORDER 19-1D SALCHA-DELTA SWCD-BPA

HOMER SOIL & WATER CONSERVATION DISTRICT

TASK ORDER 19-1 HOMER SWCD-BPA

Laguna Components

This requirement is for support of the Energetics Department of the Naval Warfare Center, Weapons Division, China Lake, CA (NAWCWD-CL). NAWCWD-CL intends to procure various types of instrumentation and electronic components over a five-year period i

Previous Slide ◀︎ Next Slide ▶︎